Continue to Site

Welcome to EDAboard.com

Welcome to our site! EDAboard.com is an international Electronics Discussion Forum focused on EDA software, circuits, schematics, books, theory, papers, asic, pld, 8051, DSP, Network, RF, Analog Design, PCB, Service Manuals... and a whole lot more! To participate you need to register. Registration is free. Click here to register now.

Defining Operating Conditions in PD using SoC Encounter

Status
Not open for further replies.

pavi622

Junior Member level 1
Joined
Apr 2, 2012
Messages
19
Helped
0
Reputation
0
Reaction score
0
Trophy points
1,281
Activity points
1,400
I am using SoC encounter for project. i wan to introduce operating conditions into the flow.
I want to know,
1. How these operating conditions are defined?
2. Is it dependent on synthesis & RTL?
3. On what basis these operating conditions are decided

Also . what is the difference between prePD and postPD netlist?
 
Last edited:

1. using setOptCond command.
2. No i think.
3. Normally best case and worst case operating condition is used for SoC Encounter do timing optimization of setup and hold.
4. Post-PD netlist has complete clock tree structure and so more accurate timing analysis with wire capacitance.
Thanks.
 

am aware of that timing operating conditions.
Apart form that if i want to define any other operating condition.
how to go about it

---------- Post added at 17:23 ---------- Previous post was at 17:23 ----------

am aware of that timing operating conditions.
Apart form that if i want to define any other operating condition.
how to go about it
 

Status
Not open for further replies.

Part and Inventory Search

Welcome to EDABoard.com

Sponsor

Back
Top