biju4u90
Full Member level 3
Suppose in my design there are multiple clocks. In such a case how the tool decides priority for each clock tree??
If I am having clk1, clk2, clk3, clk4 and clk5, which one will be synthesized and routed first? While optimization, which one will be most optimized? Or should I say my priority to the tool?
If I am having clk1, clk2, clk3, clk4 and clk5, which one will be synthesized and routed first? While optimization, which one will be most optimized? Or should I say my priority to the tool?