chuggington
Member level 1
This is going to be the first time I am working with bond pads. the design calls for the placement of the bond pads next to the IO pads. Can I just write a script like I do for IO placement to place the bonds too ? Or is there an entirely different command used that actually links a bond pad to the corresponding IO pad ? . I dont see much documentation on the same.
Pls help.
-C
Pls help.
-C