Winsu
Full Member level 3
Hi All,
Anyone has experience with this clause of the Def-Stan 59-411 part 3.
We have tried to pass a couple of times. We have place a couple of MOV in the input stage and they don't dissipate the energy completely and there is always some damage. Is there any other method that we could applied?
This is the close of the standard and a link to consult:
DCS12 – Sea. Low freq. transient
B.13 DCS12.B Imported Low Frequency Transient Susceptibility Power Lines (Sea
Services)
http://emc.jaguarlandrover.com.edge...t 3 Test Methods and Limits for Equipment.pdf
thanks a lot,
Winsu
Anyone has experience with this clause of the Def-Stan 59-411 part 3.
We have tried to pass a couple of times. We have place a couple of MOV in the input stage and they don't dissipate the energy completely and there is always some damage. Is there any other method that we could applied?
This is the close of the standard and a link to consult:
DCS12 – Sea. Low freq. transient
B.13 DCS12.B Imported Low Frequency Transient Susceptibility Power Lines (Sea
Services)
http://emc.jaguarlandrover.com.edge...t 3 Test Methods and Limits for Equipment.pdf
thanks a lot,
Winsu