onta00
Newbie level 4
Hi everyone
After the compilation, given that we are at the top level, using the report_timing we obtain a certain path with a certain time X. After changing the current design(going more inside) and using the report_timing command again, we obtain a path with a time that is HIGHER than X. Why? Shouldn't the report_timing command display the same path when we are in the top level design?
After the compilation, given that we are at the top level, using the report_timing we obtain a certain path with a certain time X. After changing the current design(going more inside) and using the report_timing command again, we obtain a path with a time that is HIGHER than X. Why? Shouldn't the report_timing command display the same path when we are in the top level design?