    How does one verify timing constraints?

    Code will often have bugs that need to be found and fixed. While there are obvious ways in how to verify VHDL and C/C++ programmes, what method exists to verify and debug timing constrainints e.g expressed in SDC format in Altera TimeQuest?

  2. #2
    Advanced Member level 5
    Points: 37,091, Level: 47
    Achievements:
    7 years registered

    Join Date
    Jun 2010
    Posts
    6,756
    Helped
    1975 / 1975
    Points
    37,091
    Level
    47

    Re: How does one verify timing constraints?

    syntax errors will throw an error in the synthesis tool
    incorrect net names will throw warnings about nets not existing.
    As for the timing, thats something you need to specify.



    •   AltAdvertisment

        
       

  3. #3
    Advanced Member level 5
    Points: 7,446, Level: 20

    Join Date
    Apr 2016
    Posts
    1,574
    Helped
    273 / 273
    Points
    7,446
    Level
    20

    Re: How does one verify timing constraints?

    Quote Originally Posted by matrixofdynamism View Post
    Code will often have bugs that need to be found and fixed. While there are obvious ways in how to verify VHDL and C/C++ programmes, what method exists to verify and debug timing constrainints e.g expressed in SDC format in Altera TimeQuest?
    there are tools that help you manage design constraints. I have never used one myself but they do exist. This is a big issue for SoC type of chips, where someone has to take ownership of all the SDCs used in all different scenarios and different blocks. It's more of a data management problem than anything else.



    •   AltAdvertisment

        
       

  4. #4
    Super Moderator
    Points: 29,904, Level: 42
    ads-ee's Avatar
    Join Date
    Sep 2013
    Location
    USA
    Posts
    6,889
    Helped
    1640 / 1640
    Points
    29,904
    Level
    42

    Re: How does one verify timing constraints?

    One verification step for timing constraints is to check the unconstrained paths and make sure it is empty or the paths that do exist are there on purpose, e.g. a static output pin that is driven to 1 or 0 only.


    1 members found this post helpful.

    •   AltAdvertisment

        
       

  5. #5
    Advanced Member level 5
    Points: 7,446, Level: 20

    Join Date
    Apr 2016
    Posts
    1,574
    Helped
    273 / 273
    Points
    7,446
    Level
    20

    Re: How does one verify timing constraints?

    Quote Originally Posted by ads-ee View Post
    One verification step for timing constraints is to check the unconstrained paths and make sure it is empty or the paths that do exist are there on purpose, e.g. a static output pin that is driven to 1 or 0 only.
    agreed. this is like a sanity check that can be done very early. but then things get complicated really fast. you can have constraints that set the same property twice but with different values. if two different designers wrote them, it is going to be a nightmare to debug.



  6. #6
    Advanced Member level 5
    Points: 37,091, Level: 47
    Achievements:
    7 years registered

    Join Date
    Jun 2010
    Posts
    6,756
    Helped
    1975 / 1975
    Points
    37,091
    Level
    47

    Re: How does one verify timing constraints?

    Quote Originally Posted by ThisIsNotSam View Post
    agreed. this is like a sanity check that can be done very early. but then things get complicated really fast. you can have constraints that set the same property twice but with different values. if two different designers wrote them, it is going to be a nightmare to debug.
    Its not just the same property with different values, different properties on the same path have a preference order.
    1. False Paths
    2. Min/Max delays
    3. Multicycle constraints

    So no matter what order you specify them, a false path always wins. But compile order comes into effect when you specify two max delays for example.



  7. #7
    Advanced Member level 3
    Points: 5,748, Level: 17

    Join Date
    Feb 2015
    Posts
    946
    Helped
    270 / 270
    Points
    5,748
    Level
    17

    Re: How does one verify timing constraints?

    Quote Originally Posted by matrixofdynamism View Post
    Code will often have bugs that need to be found and fixed. While there are obvious ways in how to verify VHDL and C/C++ programmes, what method exists to verify and debug timing constrainints e.g expressed in SDC format in Altera TimeQuest?
    I prefer the following:
    1.) Include the timing score in the FPGA programming file. My designs use 1 BRAM (4kB) to store either a 4kB text file, or a 4kB compressed text file. I then include whatever build/design info I want within this BRAM.
    2.) Perform some sanity checks in the sdc/xdc file where possible. For example, ensure some constraints constrain a non-zero number of paths. Basically, if a clock is renamed/removed you should be able to detect it. This means writing something in TCL. (sarcastic) Yay!
    3.) Check logs to ensure constraints are not ignored. Ideally this gets moved to #2 over time.
    4.) Ensure clock names and other constraints are human-readable and assumptions are well commented.
    5.) Where possible, avoid set_false_path. In tools supporting set_data_check, you almost always want that. I'm not sure if Altera has this. I attempted to check, but the documentation site hangs when I try to access it.
    6.) Avoid set_multicycle_path unless a testbench can verify this AND the design makes it clear where multicycle paths exist. Either by having clock enabled that are periodically generated, or by having the entire multi-cycle path within a module.
    7.) For any high-speed IO interface, provide a mechanism to report on IO status at runtime. Many interfaces can be placed into a test mode for this purpose. Inputs can usually use IO features to measure these things.
    8.) Understand the IO requirements of any device you connect to and follow interface requirements. For example, you can have interfaces with a negative setup time. You can have interfaces where hold time is longer than a half-cycle.


    1 members found this post helpful.

    •   AltAdvertisment

        
       

  8. #8
    Full Member level 5
    Points: 1,575, Level: 9

    Join Date
    Oct 2015
    Posts
    247
    Helped
    36 / 36
    Points
    1,575
    Level
    9

    Re: How does one verify timing constraints?

    I dont use TimeQuest, hopefully it has kinda report or messages saying about XDC file mistake.
    Vivado has it. Easy to follow and correct the constraints which are missing.

    Since you dont use a verification tool for XDC, you need to handle manually:
    1/ Take care of your over constraint of set_false_path and set_multicycle.
    2/ Clocks definition, master and generated
    3/ Boundary constraint - input/output delay with correct delay number.
    4/ Assynchronous paths with false_path or not
    5/ Derate, margin, clock uncertainty

    Those things basically cover almost quality of a SDC file.
    To improve one's brain, the doors are needed over the keys.



  9. #9
    Advanced Member level 2
    Points: 4,099, Level: 15
    Achievements:
    7 years registered

    Join Date
    Apr 2011
    Posts
    550
    Helped
    24 / 24
    Points
    4,099
    Level
    15

    Re: How does one verify timing constraints?

    I see, the nature of constraints is that they are arbitrary and as thing stand are to be checked by humans. They cannot be generated from tools expect in few cases where we can derive_pll_clocks derive_clock_uncertainity and things like that which basically reduce the number of commands we have to enter ourself.



  10. #10
    Advanced Member level 5
    Points: 37,091, Level: 47
    Achievements:
    7 years registered

    Join Date
    Jun 2010
    Posts
    6,756
    Helped
    1975 / 1975
    Points
    37,091
    Level
    47

    Re: How does one verify timing constraints?

    Quote Originally Posted by matrixofdynamism View Post
    I see, the nature of constraints is that they are arbitrary and as thing stand are to be checked by humans. They cannot be generated from tools expect in few cases where we can derive_pll_clocks derive_clock_uncertainity and things like that which basically reduce the number of commands we have to enter ourself.
    For the majority of designs, this should cover just about everything (except any IO constraints you need).
    With a clock set up, derive_pll_clocks then genreates te correct setup for the other clocks which can then check all the synchrnous logic in your design.
    Complicate SDC files are usually only needed when you start getting timing problems or lots of clock domains you need to cross.



--[[ ]]--