+ Post New Thread
Results 1 to 6 of 6
  1. #1
    Full Member level 2
    Points: 1,895, Level: 10

    Join Date
    Jun 2007
    Posts
    122
    Helped
    0 / 0
    Points
    1,895
    Level
    10

    Comparison of Setup and Hold timings with removal and recovery timings

    Hi All,

    Can any body tell me that

    In Latches do we have "Set-up" and "Hold" timings or

    or "removal" and "recovery" timings.

    and How they are different from each other.
    Does any body has doc's related to it.

    •   AltAdvertisement

        
       

  2. #2
    Advanced Member level 1
    Points: 5,380, Level: 17
    sree205's Avatar
    Join Date
    Mar 2006
    Posts
    454
    Helped
    58 / 58
    Points
    5,380
    Level
    17

    Latch Timings

    These are the definitions for recovery and removal time of asynchronous control signals as given in STA user guides.

    recovery constraint
    The minimum amount of time required between an asynchronous control signal (such as the asynchronous clear input of a flip-flop) going inactive and a subsequent active clock edge. This is like a setup check for the active clock edge.

    removal constraint
    The minimum amount of time required between a clock edge that occurs while an asynchronous input is active and the subsequent removal of the asserted asynchronous control signal. This is like a hold check for the removal of the asynchronous control signal.

    To my knowledge, setup and hold time of asynchronous signals are called recovery and removal timings.



    •   AltAdvertisement

        
       

  3. #3
    Junior Member level 2
    Points: 1,222, Level: 7

    Join Date
    Mar 2008
    Posts
    21
    Helped
    1 / 1
    Points
    1,222
    Level
    7

    Latch Timings

    You do need to check setup/hold time for latch

    Added after 28 seconds:

    You do need to check setup/hold time for latch



    •   AltAdvertisement

        
       

  4. #4
    Member level 1
    Points: 1,969, Level: 10

    Join Date
    Jul 2004
    Location
    China
    Posts
    36
    Helped
    0 / 0
    Points
    1,969
    Level
    10

    Latch Timings

    In Latches we will check the setup and hold time.You can check the sta user guide.



  5. #5
    Member level 1
    Points: 1,641, Level: 9

    Join Date
    Mar 2005
    Posts
    40
    Helped
    2 / 2
    Points
    1,641
    Level
    9

    Re: Latch Timings

    Setup and hold time checks applies to latches (enable pins) while recovery and removal applies to reset pin checks (of flops).



    •   AltAdvertisement

        
       

  6. #6
    Full Member level 4
    Points: 2,706, Level: 12

    Join Date
    Jan 2007
    Posts
    206
    Helped
    17 / 17
    Points
    2,706
    Level
    12

    Latch Timings

    Setup/hold checks should be done for latches which will be same as flops.
    and as every one said recovery and removal are the timing checks for the asyncrouns i/ps of seq elements,



--[[ ]]--