    How to the find critical path delay of a design using Design Compiler

    how to the find critical path delay of a design using Design Compiler

    any material would be of great help

    thank you

    •   AltAdvertisment

        
       

  2. #2
    Banned
    Points: 5,639, Level: 17
    Achievements:
    7 years registered

    Join Date
    Nov 2005
    Location
    Fleet, UK
    Posts
    413
    Helped
    91 / 91
    Points
    5,639
    Level
    17

    Re: critical path delay

    1. Read in your design in to design compiler
    2. report_timing
    It will give you the critical path delay.
    you can see some more commands at
    http://www.vlsiip.com/dc_shell
    Kr,
    Avi
    http://www.vlsiip.com



    •   AltAdvertisment

        
       

  3. #3
    Full Member level 5
    Points: 2,966, Level: 12
    Achievements:
    7 years registered

    Join Date
    Jul 2007
    Location
    Tokyo
    Posts
    245
    Helped
    51 / 51
    Points
    2,966
    Level
    12

    Re: critical path delay

    report_constraint -all_viol -max_delay will give all violating paths in each path group. Path groups are depends on the number of clocks in your design(default) else u can also specify path groups ..

    report_qor will also tells, in each path groups ,whats the path delay ..

    Regards,
    Sam



--[[ ]]--