Continue to Site

Welcome to EDAboard.com

Welcome to our site! EDAboard.com is an international Electronics Discussion Forum focused on EDA software, circuits, schematics, books, theory, papers, asic, pld, 8051, DSP, Network, RF, Analog Design, PCB, Service Manuals... and a whole lot more! To participate you need to register. Registration is free. Click here to register now.

Modelling re-chargeable battery in software.

Status
Not open for further replies.

rahdirs

Advanced Member level 1
Joined
May 22, 2013
Messages
424
Helped
93
Reputation
192
Reaction score
91
Trophy points
1,308
Location
Mordor
Activity points
4,492
Simulation error while modelling a re-chargeable battery in multisim.

Hi

How do u model a rechargeable model in software(Multisim) ????

  • I googled the same question and found that one can find Non Ideal Battery in Education Edition in Multisim. I was testing my circuit using a Non Ideal Battery of 12V of capacity 150Ah with internal resistance 5.5mΩ. But here's my problem - At the o/p end of my circuit earlier i was getting 14V at 1A on connecting it to an inverter. Now on connecting o/p to battery the voltage at the o/p of my circuit got changed to -14V. I am getting 4.5A current into the battery,so i'm sure it's charging but then why is voltage -14V ??

  • I also read that one can also model a rechargeable battery with a large capacitor in series with a large resistor. How large should those R & C be for a 150 Ah battery.Are those values of R & C related to internal resistance of the battery ???
 